Underground car parking in the shopping center

Local Law 126: Key Info for Parking Garage Owners

Owning a parking garage in New York City comes with many responsibilities. One of the most important is understanding and complying with Local Law 126.

Local Law 126 outlines specific requirements for parking garage inspections and maintenance. By following these guidelines, you can ensure that your facility remains safe for both vehicles and pedestrians.

Compliance isn’t just about safety; it also helps you avoid hefty penalties that can arise from failing to meet the law’s standards.

In this guide, we will walk you through the essential aspects of Local Law 126. You will learn about the key requirements and the steps you need to take to ensure your parking garage complies.

What Is Local Law 126?

Local Law 126, enacted in 2021, mandates periodic inspections of parking structures in New York City. This legislation aims to enhance public safety by identifying and addressing potential structural issues before they become hazardous.

The law establishes a framework for inspection cycles, reporting requirements, and classification of parking structure conditions. It’s part of NYC’s broader initiative to ensure the integrity of its built environment, similar to the Facade Inspection Safety Program (FISP) for building exteriors.

Local Law 126 places the responsibility on garage owners to maintain their structures and provide documentation of their condition.

Who Needs to Comply?

Local Law 126 applies to most parking structures in New York City, including:

  • buildings or portions of buildings used for parking or storing motor vehicles
  • open and enclosed parking garages as defined in the NYC Building Code
  • underground parking areas

Exemptions include:

  • automotive repair shops, showrooms, and service stations
  • garages with fewer than three cars
  • unenclosed, unattached outdoor parking lots
  • private garages serving one- and two-family homes

Key Deadlines and Inspection Cycles

Compliance with Local Law 126 is organized into six-year cycles, further divided into three sub-cycles based on borough and community district:

  1. Sub-cycle A (January 1, 2022 – December 31, 2023): Manhattan Community Districts 1-7.
  2. Sub-cycle B (January 1, 2024 – December 31, 2025): Manhattan Community Districts 8-12 and all Brooklyn Community Districts.
  3. Sub-cycle C (January 1, 2026 – December 31, 2027): All Bronx, Queens, and Staten Island Community Districts.

For newly constructed buildings, the initial compliance report must be filed six years from the date of the first Temporary Certificate of Occupancy (TCO), Interim Certificate of Occupancy (ICO), or Certificate of Occupancy (CO). If this falls outside the property’s sub-cycle filing window, the report must be filed within the next applicable sub-cycle.

Inspection Process Overview

The inspection process under Local Law 126 involves several key steps:

  1. Hiring a Qualified Parking Structure Inspector (QPSI): Owners must engage a New York State licensed professional engineer certified by the Department of Buildings (DOB) as a QPSI.
  2. Document review: The QPSI reviews available structural designs, repair drawings, previous reports, and violation records.
  3. Visual inspection: The QPSI conducts a thorough visual examination of all visible surfaces of the parking structure.
  4. Physical examination: At least 10% of each structural element type (e.g., beams, columns, slabs) must undergo physical examination, focusing on areas with observed deterioration.
  5. Condition assessment: The QPSI designs an assessment program based on the structure’s construction type, age, environmental conditions, and maintenance history.
  6. Report preparation: A comprehensive report detailing the findings, including photos and recommendations, is prepared.
  7. Classification: The structure is classified as Safe, SREM (Safe with Repair and/or Engineering Monitoring), or Unsafe.
  8. Report filing: The QPSI files the report with the DOB within 60 days of the final inspection.
  9. Annual observation checklist: The QPSI creates a checklist for annual inspections to be conducted between filing cycles.

Classifications: Safe, SREM, and Unsafe

After inspection, your parking structure will receive one of three classifications:

  1. Safe: No repair work is needed, and the structure is deemed safe until the next inspection cycle.
  2. SREM (Safe with Repair or Engineering Monitoring): Minor damage is present, but the structure is currently safe. However, repairs must be made within a specified timeframe to prevent deterioration to an unsafe condition. A follow-up inspection and report are required within three years.
  3. Unsafe: Severe damage poses an immediate hazard. Owners must take immediate action to protect public safety, such as cordoning off dangerous areas or installing protective measures. Repairs must be completed within 90 days of filing the report unless an extension is granted.

To learn more about how these classifications impact your property and the steps you need to take for each, check out our article “How Local Law 126 Improves Parking Garage Safety.”

Penalties for Non-Compliance

Failing to comply with Local Law 126 can result in significant penalties:

  • late filing: $1,000 per month
  • failure to file: $5,000 per year
  • failure to correct Unsafe conditions: $1,000 per month
  • failure to correct SREM conditions: $2,000 (one-time penalty)

Additionally, there are filing fees associated with the inspection process:

  • initial report: $305
  • amended/subsequent report: $85
  • extension request: $65

How Nova Construction Services Can Help

Ensure your parking structure’s compliance with Local Law 126. Nova Construction Services offers expert QPSI inspections and comprehensive repair solutions to keep your property safe and violation-free.

For a detailed breakdown of the inspection process and what to expect, read our article “Inspection Requirements for Parking Under Local Law 126.”

FAQ

What is Local Law 126 and how does it affect owners of parking structures?

Local Law 126 requires owners of parking structures in New York City to have periodic inspections performed every six years to ensure safety and compliance with the NYC construction codes.

What is the role of the NYC DOB in relation to Local Law 126?

The NYC Department of Buildings (DOB) oversees the enforcement of Local Law 126, requiring parking structure owners to file condition assessment reports and ensure that inspections are performed as mandated by the NYC administrative code.

What is a condition assessment report and when must it be filed?

A condition assessment report is a document that details the findings from the periodic inspections of a parking structure. It must be filed with the NYC DOB following the inspection, as required by 1 RCNY §103-13.

Get in touch.

Access

Nova Construction Services offer access services.
We offer the following services:

Sidewalk Shed

Suspended Scaffolding

Pipe Scaffolding

Material Hoist

Consulting

Based on our many years of experience, we offer consulting services in the following areas:

Emergency Repairs

Mortar And Stone Analysis

Aeriallift Inspections

Test Cleaning

Suspended Scaffolding Inspection

Roofing Analysis

Concrete & Coating

Nova Construction Services offer concrete & coating services.
Concrete is one of the most frequently used building materials. It is used extensively for a wide range of construction work, such as footpaths, driveways and roads, residential and commercial construction – floors and walls, foundations and footings, for posts, fences and walls, and even boat hulls.
Precast concrete is typically stronger than natural cut limestone, but it doesn’t have the look of natural cut stone. Cast Stone, on the other hand, solves both problems. Cast Stone can be stronger than precast concrete and is easily cast to produce identical pieces.

Sidewalk Replacement

Coating Repair And Installation

Cast Stone Installation

Vault Repairs And Replacement

Gfrc / Gfrp Cornice Restoration

Concrete Eyebrow And Structural Repairs

Architectural Metals

Nova Construction Services offer architectural metals services.
Architectural metalwork is a unique factor in the building process that involves using metalwork practices to create structures that are not only functional but also have a strong aesthetic role to play too. It is the bringing together of metalwork and architecture.
Architectural steel fabrication often involves the use of decorative elements, such as ornamental railings, staircases, and facades. On the other hand, structural steel fabrication is concerned with the strength and stability of the building.
As part of the architectural metals service, Nova Construction Services offers:

Cast Iron Repair & Replacement

Fire Escape Restoration

Cornice Retoration  & Replacement

Steel Retoration & Replacement

Canopy, Entrace & Gate Restoration

Window Restoration

Copper Roof Replacement

Ralling Replacement

Skylight Replacement

Structural Shoring

Architectural Stones

Nova Construction Services offer architectural stones services.
Stone is a highly durable, low maintenance building material with high thermal mass. As a natural substance that is quarried and mined from the earth and used in a variety of applications in construction, including: masonry, including decorative elements such as pillars, swags and porticos, floor and wall tiles and cladding.
As part of the facade restoration service, we offer the following:

Landmark Preservation

Terra Cotta Repair Replacement

Limestone, Brownstone and Granite Repair and Replacement

Roofing & Waterproofing

Nova Construction Services offers roofing & waterproofing services.
Waterproofing is a process designed to prevent liquids from entering a structure. Comprehensive waterproofing measures are often added to the building to provide moisture control during construction, and waterproofing materials are applied after the structure is built to eliminate any problems that may be encountered.
As part of the roof & waterproofing service, Nova Construction Services offers:

Roof Replacement

Slate Roof Replacement

Roof Recovery

Balcony and Tarace Waterproofing

Façade restorations

Nova Construction Services offers façade restorations services.
This process is the process that reveals the appearance of the building. Facade systems are made with very different materials. These can be processes such as styrofoam coating, glass coating and metal coating. The main purpose of facade treatments made of these, or other materials is to protect the building.
Façade restorations means aesthetic improvements to the front of a building including installing, restoring, replacing or repairing awnings, windows, doors, cladding, and architectural features.

Mansory Restoriation

Stucco Installation

Local Law 11 Repairs

Facade and Stone Cleaning

Metal Panel Systems